MC Question

  • Hi guys,


    As I'm desperately trying to get my mashine running I have a question about MC's. Hav't translated all manual from german to english yet, but half way so far :smiling_face:

    Here Are a few witch I think should be changed from the MC's I have on my list.

    MC 11 is the designated working plane standart is C-1=G18. As I plan to use only 90degree haad should I change it ti C0=G17 stright away?

    MC29 Is tool life monitoring. As mashine has no automatic tool changer I 'dont think, there is anny reason monitor tool life and gat extra alarms over it.

    B Axis. Has only digital reedout., no drive motor. So is it counted as auxillary axis or not?

    MC 115 is Axis measuring system control loop C1- Closed loop, C-2 Open loop, C-3 Demo mode. On MC code I have MC 117=B axis measuring system is set to C5.

    Logicaly thinking ir should be C1, C2 ore C3.

  • Dieses Thema enthält 3 weitere Beiträge, die nur für registrierte Benutzer sichtbar sind, bitte registrieren Sie sich oder melden Sie sich an um diese lesen zu können.

Jetzt mitmachen!

Sie haben noch kein Benutzerkonto auf unserer Seite? Registrieren Sie sich kostenlos und nehmen Sie an unserer Community teil!