Hi guys,
As I'm desperately trying to get my mashine running I have a question about MC's. Hav't translated all manual from german to english yet, but half way so far
Here Are a few witch I think should be changed from the MC's I have on my list.
MC 11 is the designated working plane standart is C-1=G18. As I plan to use only 90degree haad should I change it ti C0=G17 stright away?
MC29 Is tool life monitoring. As mashine has no automatic tool changer I 'dont think, there is anny reason monitor tool life and gat extra alarms over it.
B Axis. Has only digital reedout., no drive motor. So is it counted as auxillary axis or not?
MC 115 is Axis measuring system control loop C1- Closed loop, C-2 Open loop, C-3 Demo mode. On MC code I have MC 117=B axis measuring system is set to C5.
Logicaly thinking ir should be C1, C2 ore C3.